Skip to main content
Booster KitsBrake Instruction SheetsInstruction Sheets

Hydro Booster, Gear box and power steering pump Installation Layout

By March 29, 2011March 13th, 2012No Comments

PUMP AND BOX MUST BE CLEAN

  1. Connect from small port of power steering pump to the large port in hydro boost end, reusable fitting will go on top of a metric 15 new style or a 5/8 flared fitting (sometimes using a 45 or 90 degree adapter).
  2. Connect from small port of hydroboost to big port of Box.
  3. From spitter of hydroboost to box small port to side of T on 16 or 5/8, depending on style of power steering pump.
  4. From 90 degree (connected to T), connect to large port of Power steering pump.